RAAF A47 Boeing P-8A Poseidon, Edinburgh Airshow 8-10 Nov 2019
The Boeing P-8 Poseidon (formerly the Multimission Maritime Aircraft or MMA) is a military aircraft developed for the United States Navy (USN). The aircraft has been developed by Boeing Defense, Space & Security, modified from the 737-800ERX. The P-8 conducts anti-submarine warfare (ASW), anti-surface warfare (ASUW), and shipping interdiction, along with an early warning self-protection (EWSP) ability, otherwise known as electronic support measures (ESM). This involves carrying torpedoes, Harpoon anti-ship missiles, and other weapons. It is able to drop and monitor sonobuoys. It is designed to operate in conjunction with the Northrop Grumman MQ-4C Triton Broad Area Maritime Surveillance unmanned aerial vehicle.
The P-8 is operated by the U.S. Navy, the Indian Navy (as the P-8I Neptune), and the Royal Australian Air Force (RAAF). The aircraft has been ordered by the UK's Royal Air Force (RAF) where it will be known as the Poseidon MRA1, the Royal Norwegian Air Force (RNoAF), and the Royal New Zealand Air Force (RNZAF).
The Lockheed P-3 Orion, a turboprop ASW aircraft, has been in service with the United States Navy since 1962. In the 1980s, the Navy began studies for a P-3 replacement, the range and endurance of which were reduced due to increasing weight and airframe fatigue life limitations. The specification required a new aircraft to have reduced operating and support costs. In 1989, the Navy awarded Lockheed a fixed-price contract to develop the P-7, but this was canceled the following year. A second competition for a replacement began in 2000. Lockheed Martin submitted the Orion 21, an updated new-build version of the P-3. Boeing's proposal was based on its 737-800 airliner. BAE Systems offered a new-build version of the Nimrod MRA4, a British jet-powered maritime patrol aircraft. BAE withdrew from the competition in October 2002, recognizing that without a production partner based in the United States, the bid was politically unrealistic. On 14 May 2004, Boeing was selected as the winner.
The P-8 is to replace the P-3 Orion. At first, it will be equipped with legacy P-3 systems, but later upgrades will incorporate more advanced technology. The Government Accountability Office credited the incremental approach with keeping the project on schedule and on budget. The Naval Air Systems Command (NAVAIR) deleted the requirement for the P-8A to be equipped with magnetic anomaly detection (MAD) equipment as part of an effort to reduce weight by 3,500 lb (1,600 kg) for improved endurance and range. A hydrocarbon sensor detects fuel vapors from diesel-powered submarines and ships.
The P-8's first flight was on 25 April 2009. The second and third P-8s had flown and were in flight testing in early August 2010. On 11 August 2010, the US approved the P-8 for low-rate production. A P-8 released sonobuoys for the first time on 15 October 2010, dropping six sonobuoys in three separate low-altitude passes. In 2011, it was found that the P-8's ice detection system was defective due to the use of counterfeit components; allegedly these computer parts were poorly refurbished and sold to subcontractor BAE Systems as new by a Chinese supplier.
A Boeing P-8A Poseidon flying alongside a Lockheed P-3C Orion, close to Naval Air Station Patuxent River, Maryland, 2010
On 24 June 2013, a P-8 successfully scored a direct hit with a live AGM-84D Block IC Harpoon anti-ship missile during weapons integration testing. On 1 July 2013, an initial operational test and evaluation (IOT&E) report found that the P-8A was "operationally effective, operationally suitable, and ready for fleet introduction." Six test and nine low-rate initial production aircraft had been delivered at that point. On 31 July 2013, Boeing received a $2.04 billion contract to build 13 P-8As in the fourth low-rate initial production lot, for a fleet of 37 aircraft by the end of 2016, and long-lead parts for 16 P-8As of the first full-rate production lot.
The P-8 features the Raytheon APY-10 multi-mission surface search radar; the P-8I features an international version of the APY-10. Unlike the preceding P-3, the P-8 lacks a magnetic anomaly detector (MAD) due to its higher operational altitude; its acoustic sensor system is reportedly more effective at acoustic tracking and thus lacking a MAD won't impede its detection capabilities; India's P-8I is equipped with a MAD per the contract request. Various sensor data are combined via data fusion software to track targets. Following the cancellation of Lockheed Martin's Aerial Common Sensor project, Boeing proposed a signals intelligence variant of the P-8 for the Navy's requirement. During the P-8A Increment 2 upgrade in 2016, the APS-149 Littoral Surveillance Radar System (LSRS) will be replaced by the Advanced Airborne Sensor radar.
On 20 July 2007, the Australian Minister for Defence announced selection of the P-8A MMA as the preferred aircraft to replace the Royal Australian Air Force fleet of Lockheed AP-3C Orions in conjunction with then yet-to-be-selected unmanned aerial vehicle. The last AP-3C is scheduled to be retired in 2018, after nearly 30 years of service. In March 2009, Australia's Chief of Air Force stated that subject to government approval, the RAAF would begin to introduce the P-8 in 2016. In October 2012, Australia formalized its participation with a commitment of A$73.9m (US$81.1m) in an agreement with the USN. In July 2013, Air Marshal Geoff Brown, head of the RAAF, said Australia was considering purchasing more P-8s and fewer MQ-4C Triton UAVs than earlier planned. On 21 February 2014, Prime Minister Tony Abbott announced Australia's intention to procure eight P-8s plus options for four more; entry into service is planned for 2021.
An Australian P-8 Poseidon in 2018
In July 2014, negotiations commenced between Boeing and the Department of Defense for integration of the AGM-84 Harpoon Block 1G anti-ship missile onto the P-8A on behalf of Australia, which is reportedly a matter of interfacing with the aircraft's combat system software. In August 2014, the US Navy had reportedly concluded an advanced acquisition contract on the first four of up to 12 P-8As to be purchased by Australia, with delivery expected from 2017. Boeing confirmed that "production of the first Australian P-8A will begin later in 2015, with delivery to the RAAF scheduled for 2016." In January 2016, Australia ordered a further four P-8s. The 2016 Defence White Paper stated that eight P-8s would be in service in the early 2020s and that 15 P-8s are planned to be in service by the late 2020s. On 19 July 2016, the US DoD announced Boeing's award of a $100 million contract for the next tranche of four P-8As, with completion projected for June 2017. Including support facilities, the first group of eight aircraft's total cost is estimated at $3.6 billion (AU$4 billion).
The RAAF accepted its first P-8 on 27 September 2016; it arrived in Australia on 14 November.
– https://en.wikipedia.org/wiki/Boeing_P-8_Poseidon